Tuesday, February 20, 2007

Coming back from a four day weekend can be rough. The first thing I wanted to do this morning was go back to sleep. Cory and I got the vent hood over the stove installed. A procedure which required cutting out the sheet rock between two studs and cutting openings in the boards running above and below the studs. Finally, a cut through the plywood flooring gave us the path from kitchen to upper attic. The kitchen is a little closer to complete, and there only needs to be a little more work done to get the upstairs ready for new texture and paint. Hopefully I can finish it all up by the end of next weekend.