Contact the Alien Home
  webmail
contact me
TEXT

Friday, September 21, 2007

I'm not sure why but, the last few weeks there hasn't been much work done on the house. The upstairs is almost done except for the bathroom. Before Amy left, she chipped and removed all the tile on the floor and I have to say, plywood is not a good finished floor material. This plywood soaks up the moisture that a bathroom creates. The portion under the toilet in new plywood, which seems to indicate what actually happened to the wall in the entry room, and why it's covered over with two giant mirrors. Well, finally something big happened. The windows that I had custom built were installed yesterday. I couldn't be there at 11:00, so I got Jen to hang out at the house and let them in. It didn't take that long, and I really like the results. The color of the frame works great on the inside of the house and against the brick but, you can see from the last two pictures that it's a little light for the siding. I was planning on painting the house before the end of the year, and this definitely narrows down the color choices.

Labels:

0 Comments:

Post a Comment

Links to this post:

Create a Link

<< Home

 

Powered by Blogger Valid HTML 4.01!